Pre-Con Injection Case Study

This is a case study of a pre-construction injection operation on a excavated house pad.  The soils on the site were stiff and dry. Pre-treatment swell potentials were as high as 12%+ and post treatment results were well below the 2% average swell specification given by the geotechnical engineers.

Case study – Pre-Construction injections

Back to main Project Data page